About air krete®

Air Krete has revolutionized the insulation world:

  • 100% green - enviornmentally safe
  • Airkrete is the safest, most durable and highest performing insulation in the market today.
  • Airkrete is non-toxic, CFC, 100% fireproof and easy to install.

Use Airkrete for:

  • Houses pre-1975
  • New constructions
  • Schools
  • Condominiums
  • Apartment Buildings
  • Nursing Homes
  • Recording Studios
  • Universities
  • Libraries
  • Art Gallaries
  • Innovations

Custom Builders choose Airkrete for discerning clients who desire safety , quality and performance from insulation.

Airkrete is the planet's greenest, safest and best performing insulation.

postheadericon MSDS Information

Benefits of Air Krete
  • air krete® Insulation sample was resistant to mold growth at both 75% and 95% relative humidities. Neither molds were found to amplify in the materials at either humidity.
  • air krete®, over time, maintains a very high insulation value. (R = 3.9 at 2.07 lbs/ft3)
  • air krete® seals very effectively around the edges from infiltrating air.
  • air krete® does not expand, shrink or settle and is 100% cavity filling. It fills around and behind any obstructions and crevices. ( Dimensional stability- ASTM C 951: zero shrinkage)
  • air krete® does not inflict damage to environment or man. Material is non-toxic, does not create any ozone-depleting CFC’s and does not contain any formaldehyde or carcinogenic fibers.
  • air krete® does not burn and does not release any smoke and is also used as fire-stop material. ( ASTM E 84: 0- flame spread, 0- fuel contribution, 0- smoke-Test extended to 30 minutes with no further flame progression)
  • air krete® has a de-oiling effect and deters any rodents or insects.
  • air krete® is fully recyclable and can be used to enrich soil.
  • air krete® is very flexible and adaptable in its use in wall, roof and ceiling cavities in new or old construction.
  • air krete® is very cost-effective.
  • air krete® has the ability to absorb moisture without loss of insulation value. It therefore tempers and regulates indoor air humidity and enhances healthy and comfortable air quality.
  • air krete® is also a soundproofing material and used very effectively in interior sound partitions. In encasing plumbing pipes, water noises are very effectively reduced.
  • Because air krete® is Magnesium Oxide (MGO), a refractory cement it is ideal for high temperature applications.

postheadericon How it Works

The Buckeye State's Residential and Commercial Thermal Insulation Leader.

air krete®, a cementitious foam insulation, has no plastic , asbestos, urea formaldehyde, formaldehide, phenol formaldehyde or patrolum based ingrediants. air krete® is a combination of ceramic tile and magnesium oxide. air krete®'s unique process coats air bubbles with this formula. It looks and feels like shaving cream. It is poured into the cavities of homes and buildings at low pressure. air krete® dries within 24 hours and will not expand, shrink or settle over time.

Because the non-toxic air krete® bubbles create an R-value of 3.9 per sq inch, your house or building stays warmer in the winter and cooler in the summer. Heating and cooling costs are reduced, some as much as 60%! Because air krete® doesn't shrink or settle over time, it never loses its R-value.

air krete® is fireproof, non-toxic, mold resistant, sound performing, insect and rodent resistant. It produces no hazardous waste or dust, and no off-gasing.
 

 

postheadericon Specifications

The following is a guide specification for an ultra light foamed cementitious product of a density and formulation that offers a maximum of thermal efficiency.

Part 1 General

  • a. Work under this section consists of the furnishing of all labor, materials and equipment necessary for or incidental to the complete and proper installation of all cementitious foamed insulation as shown on the drawings or specified herein, all in accordance with the contract documents.
  • b. Material and installation shall conform to applicable building code requirements of all authorities having jurisdiction.

1.02 Related Work A. See PART 3

1.03 Quality Assurance

  • a. Manufacturer shall furnish evidence of licensure by air krete® , inc.
  • b. Applicator shall furnish evidence of training, experience and approval of the manufacturer.
  • c. Contractor shall furnish certifications that materials used are fireproof, inorganic and free of carcinogenic mineral fibers or toxic substances.

1.04 Delivery, Storage and Handling

  • a. Materials shall be delivered to the site in clearly labeled containers and mixed in strict accordance with the manufacturer's directions.
  • b. Materials shall be protected from the weather and other damage.
  • c. Damaged materials found unsuitable for use will be rejected and shall be removed from the site.

1.05 Project, Site Conditions

  • a. air krete® shall be installed when the combination of indoor and outdoor temperatures is such that the temperature at the point of application is 40F (4.50C) and rising during the application process and 48 hour initial curing.
  • b. If necessary for job progress, provide enclosures with heat to maintain temperatures through initial curing.
  • c. Provide natural ventilation to properly cure the foamed insulation during and subsequent to its application.

1.06 Cleaning

  • a. After completion of insulation work in an area, equipment shall be removed and all surfaces shall be cleaned of all deposits of insulation material.


Part 2 Products

2.01 Manufacturer

  • a. Manufacturer shall be a licensee of air krete® , inc.

2.02 Materials

  • a. Cementitious Foam Insulation: shall be air krete® , foamed to a density of 2.07 lbs/cu ft +/- 6% so as to produce an R value of 3.9 per inch of thickness as measured by ASTM C518-76 @ 75F.
  • b. Retention Fabric: if required shall be 18 x 14 mesh aluminum screening or other material sufficiently porous to permit curing of insulation and sufficiently rigid to prevent deformation. Consult manufacturer for other alternatives.
  • c. Vapor Barrier (if required): shall be 6 mil. Polyethylene film or other suitable material impervious to moisture.
  • d. Attachments: shall provide support and protection to fabric and insulation without failure under conditions of use.

Part 3 - Execution

3.01 Preparatory Work

  • a. Work of other trades: verify by inspection and with the general contractor that preparatory work specified in Division4,5,6,15 and16 has been properly done, i.e. that masonry block cores and cavities are free of debris and excess mortar droppings, that stud spaces are accessible, free of debris and contain all scheduled pipes, conduits and non-heat producing devices and that heat-producing devices and elements that are not inherently fireproof are shielded such that insulation will be held 3" away.
  • b. Protection: provide drop cloths, masking or other protection as required to prevent damage to adjacent surfaces and equipment. Consult manufacturer.

3.02 Application

  • a. Mixing: component materials shall be mixed using the quantities, proportions and the pressures called for in the manufacturer's specifications for the purpose intended.
  • b. Masonry, new: completely fill block cores and cavities between wythes in lifts not to exceed 25'-0".
  • c. Masonry, retrofit: access between wythes with holes large enough to accommodate hose, at 4'-0"; on center each way; fill cavities completely; plug holes with non-shrink mortar to match existing. Consult manufacturer for retrofit core filling and other alternatives.
  • d. Stud spaces, new: Metal and Wood: Foamed in place through or behind drywall prior to taping and spackling or behind appropriate retention fabric. Consult manufacturer for other alternatives.
  • e. Stud space, retrofit: access spaces 12'-0" or less in height at a point two-thirds of their height above their bottom. Taller spaces shall be accessed such that no lift of air krete exceeds 25'-0". Fill spaces completely, plug holes after foaming with material to match existing.
  • f. Ceiling spaces: fill to depth shown in a manner similar to that specified for stud spaces. If a vapor barrier is required, it may be used as a combination vapor barrier and retention fabric.
  • g. Pipe chases: fill completely after all required inspections and tests have been performed.
  • h. Fireproofing, very high temperature, sound deadening and encapsulation applications: consult manufacturer.

3.03 Field Quality Control

  • a. Density: contractor shall conduct a timed, field density check at the beginning, middle and end of each days application. Check shall be done in accordance with the manufacturer's instructions and a log of results maintained for the architect's review.
  • b. Continuity; at the architect's discretion, an infrared thermo graphic test may be required. If the test proves the installation is satisfactory, its cost will be borne by the owner. If the test shows discontinuity, its cost and the cost of achieving continuity shall be borne by the contractor.